Arc-on time, pierce dwell, consumable wear, and shop rate rolled into a cost per part — with batch totals for the whole run.
Live
A free plasma cutting cost calculator for CNC tables. Enter cut speed, path length, pierce count, consumable life, material cost, and shop rate to get cycle time per part, consumable cost, material cost, and total cost per part and per batch. Useful for quoting jobs, comparing nesting strategies, or checking whether a job is worth running in-house.
Plasma Cut Cost Estimator
Per-part time · consumables · shop cost
Estimate · model exact, inputs yours
Machine & cut settings
No manufacturer CNC cut chart exists for this machine. Seeds below are community-reported real cuts (PlasmaSpider / Langmuir forums) — starting points to dial in, not verified data. Edit freely; your dialed-in numbers win.
ipm
A
s
Job
in
×
pcs
s
s
Your shop numbers
$/hr
$
$
arc-min
These defaults are placeholders, not recommendations — nobody publishes your shop rate. Pierce-heavy work and damp air shorten consumable life well below catalog claims; track a few sets and put your real number in.
Estimated cost per part
$2.00
1.89 min cycle · 1.29 min arc-on · estimate only
Machine time cost
$1.89
cycle time × shop rate
Consumables
$0.11
arc-min × set $/arc-min
Material
$0.00
as entered
Arc-on time / part
1.29 min
cutting + pierce dwell
Cycle time / part
1.89 min
+ motion + handling
Pierce share of arc
3%
high % = pierce-dominated job
Batch
Total (1 pcs)
$2.00
Total table time
1.89 min
excludes programming & setup
Programming, nesting, and first-article time aren't in this number — for one-offs they can dwarf the cutting. Add them mentally or fold them into handling for short runs.
§ Common Questions
Frequently asked
How do you calculate plasma cutting cost per part?
Add machine time (arc-on time plus pierce dwell and rapids, multiplied by your shop rate), consumable cost amortized over consumable life, and material cost for the part's nested area. This tool does all three and totals them.
Why does pierce count matter so much?
Each pierce adds dwell time and consumes far more electrode and nozzle life than steady cutting. Parts with many small holes can cost several times more than their cut length alone suggests.
What shop rate should I use?
Use a rate that covers machine ownership, power, gas, floor space, and your labor. Consumables and material are separate line items here, so do not double-count them in the rate.